Skip to main content

An Open Access Journal

Table 1 Lines with ETCS in commercial operation [36]

From: European railway traffic management system validation using UML/Petri nets modelling strategy

Country

Line

Length (km)

ETCS level

Year

Supplier

Austria

Vienna to Hungarian border section Hegyesschalom

67

1

2006

Siemens / Thales

Bulgaria

Sofia – Plovdiv – Burgas

440

1

2001

Thales

Germany

Berlin – Halle/Leipzig

135

2

2005

Siemens / Thales

Hungary

Hodos – Zalacséb-S.

23

1

2004

Thales

(Vienna-) Hegyeshalom – Budapest

Thales

1

2007

Thales

Italy

Milano – Bologna

182

2

2008

Ansaldo STS/Alstom

Torino – Novara

90

2

2006

Ansaldo STS/Alstom

Roma – Napoli

200

2

2005

Ansaldo STS/Alstom

Luxembourg

60% of the CFL network, including Luxembourg station

162

1

2005 - 2008

Thales

Netherlands

Betuwe Line Rotterdam – Zevenaar

110

2

2007

Alstom

Spain

Lérida – Roda

91

1/2

2006

Thales

Córdoba – Malaga

155

1/2

2006

Invensys

Roda – Barcelona

99

1/2

2008

Thales

Madrid Valladolid

180

1/2

2007

Thales

Madrid Lérida

440

1/2

2006

Ansaldo STS

Switzerland

Mattstetten – Rothrist (Olten – Berne)

45

2

2007

Thales

Löstchberg base tunnel between Frutigen – Visp (Bern- Brig)

35

2

2007

Thales

Total length of lines with ETCS in commercial operation

2,644 km