Skip to main content

An Open Access Journal

Table 1 The relocation costs for the four different measures

From: Estimated societal costs of a hierarchical measures approach to enhanced school transportation safety at bus stops on roads with high speed limits

 

Measure

1a

2b

3

4

Fixed costs (€)

26.7 (–)

466,738

5.0

54,894

Flexible costs (€/km)

1.9 (6.4)

1.0

  1. The fixed cost is related to each new tour
  2. aPresented for contracted school transportation vehicles, public transport buses in brackets
  3. bThe total cost for the new construction