Table 2 CO2 emissions in the construction phase of the BBT

From: A heuristic method for determining CO2 efficiency in transportation planning

Main process elements

Sub-process elements

CO2 [kt]

Boring works

Conventional excavation

17.68

Mechanical excavation

101.91

Manufacturing of TBMs

3.10

Transportation of TBMs

0.36

Rock blasting

7.01

Subtotal

130.07

Transportation using belt

14.70

Transportation of the spoil

Transportation using trucks

5.74

Subtotal

20.45

Production of the construction materials

Concrete

1,580.37

Steel

358.55

Transportation of the construction materials using trucks

2.51

Subtotal

1,941.44

Working sites

Ventilation and cooling of the tunnels

150.71

Water treatment plants

14.26

Functioning of the offices and the mechanical shops

1.48

Lighting of the tunnels

8.75

Lighting of the external areas

13.19

Subtotal

188.39

Total

2,280.35

Total (rounded)

2,280