Skip to main content

An Open Access Journal

Table 2 Scheduling proposed by the IM and a priori utilities of the TOs (Example 1)

From: A game theoretic model for re-optimizing a railway timetable

 

Departure time

A priori utility

TO1

9.20

u ^ 1 9.20 = 30

TO2

9.58

u ^ 2 9.58 = 30

TO3

10.00

u ^ 3 10.00 = 30

TO4

10.45

u ^ 4 10.45 = 15

TO5

11.00

u ^ 5 11.00 = 30