Skip to main content

An Open Access Journal

Table 4 Scheduling and “real” utilities after the agreement of the TOs (Example 1)

From: A game theoretic model for re-optimizing a railway timetable

 

Departure time

“Real” utility

TO1

9.20

u r1 (9.20) = 30

TO2

9.43

u r2 (9.43) = 29.50

TO3

9.45

u r3 (9.45) = 30

TO4

10.30

u r4 (10.30) = 30

TO5

11.00

u r5 (11.00) = 30