Fig. 13From: Complex railway systems: capacity and utilisation of interconnected networksUtilization rates for Belgian (passing or halt) stations with maximum 6 platforms, assuming a daily operating time of 20 h, 20 % of the trains using the main tracks just passing (no stopping), in addition to a dwell time of 3 min and 0 %–50 % of movements assigned to the lateral tracks (left) or a dwell time of 1, 3, 5 min and current flows’ distribution among of the platforms (right)Back to article page