TY - JOUR AU - Grayman, W. M. PY - 2005 DA - 2005// TI - Incorporating uncertainty and variability in engineering analysis JO - J Water Resour Plan Manag VL - 131 UR - https://doi.org/10.1061/(ASCE)0733-9496(2005)131:3(158) DO - 10.1061/(ASCE)0733-9496(2005)131:3(158) ID - Grayman2005 ER - TY - JOUR AU - Uusitalo, L. AU - Lehikoinenb, A. AU - Hellec, I. AU - Myrberga, K. PY - 2015 DA - 2015// TI - An overview of methods to evaluate uncertainty of deterministic models in decision support JO - Environ Model Softw VL - 63 UR - https://doi.org/10.1016/j.envsoft.2014.09.017 DO - 10.1016/j.envsoft.2014.09.017 ID - Uusitalo2015 ER - TY - JOUR AU - Ameri, M. AU - Moayedfar, R. AU - Jafari, F. PY - 2013 DA - 2013// TI - Determination the capacity of two-lane suburban roads with neural networks and effect of speed on level of service JO - Eur Transp Res Rev VL - 5 UR - https://doi.org/10.1007/s12544-013-0096-y DO - 10.1007/s12544-013-0096-y ID - Ameri2013 ER - TY - JOUR AU - Mukherjee, A. AU - Majhi, S. PY - 2016 DA - 2016// TI - Characterisation of road bumps using smartphones JO - Eur Transp Res Rev VL - 8 UR - https://doi.org/10.1007/s12544-016-0200-1 DO - 10.1007/s12544-016-0200-1 ID - Mukherjee2016 ER - TY - JOUR AU - Wu, J. AU - Liu, P. AU - Tian, Z. Z. AU - Xu, C. PY - 2016 DA - 2016// TI - Operational analysis of the contraflow left-turn lane design at signalized intersections in China JO - Transp Res Part C: Emerg Technol VL - 69 UR - https://doi.org/10.1016/j.trc.2016.06.011 DO - 10.1016/j.trc.2016.06.011 ID - Wu2016 ER - TY - JOUR AU - Schnebele, E. AU - Tanyu, B. F. AU - Cervone, G. AU - Waters, N. PY - 2015 DA - 2015// TI - Review of remote sensing methodologies for pavement management and assessment JO - Eur Transp Res Rev VL - 7 UR - https://doi.org/10.1007/s12544-015-0156-6 DO - 10.1007/s12544-015-0156-6 ID - Schnebele2015 ER - TY - JOUR AU - Arroju, R. AU - Gaddam, H. K. AU - Vanumu, L. D. AU - Rao, K. R. PY - 2015 DA - 2015// TI - Comparative evaluation of roundabout capacities under heterogeneous traffic conditions JO - J Mod Transp VL - 23 UR - https://doi.org/10.1007/s40534-015-0089-8 DO - 10.1007/s40534-015-0089-8 ID - Arroju2015 ER - TY - BOOK AU - Mauro, R. PY - 2010 DA - 2010// TI - Calculation of roundabouts PB - Springer-Verlag CY - Berlin Heidelberg UR - https://doi.org/10.1007/978-3-642-04551-6 DO - 10.1007/978-3-642-04551-6 ID - Mauro2010 ER - TY - JOUR AU - Gao, Y. AU - Rong, G. AU - Yang, L. PY - 2015 DA - 2015// TI - Analysis of order statistics of uncertain variables JO - J Uncertain Anal Appl VL - 3 UR - https://doi.org/10.1186/s40467-014-0025-1 DO - 10.1186/s40467-014-0025-1 ID - Gao2015 ER - TY - BOOK AU - Vose, D. PY - 2008 DA - 2008// TI - Risk analysis: a quantitative guide PB - Sons, Inc. CY - New York, USA ID - Vose2008 ER - TY - STD TI - Matas A, Raymond JL, Ruiz A (2012) Traffic forecasts under uncertainty and capacity constraints. Transportation 39(1):1–17. doi:10.1007/s11116-011-9325-1 ID - ref11 ER - TY - JOUR AU - Bie, J. AU - Lo, H. K. AU - Wong, S. C. PY - 2010 DA - 2010// TI - Capacity evaluation of multi-lane traffic roundabout JO - J Adv Transp VL - 44 UR - https://doi.org/10.1002/atr.124 DO - 10.1002/atr.124 ID - Bie2010 ER - TY - JOUR AU - Kyte, M. AU - Dixon, M. AU - Basavaraju, P. PY - 2003 DA - 2003// TI - Why field measurements differ from model estimates analysis - framework for capacity and level-of-service analysis of unsignalized intersections JO - Transp Res Rec VL - 1852 UR - https://doi.org/10.3141/1852-05 DO - 10.3141/1852-05 ID - Kyte2003 ER - TY - JOUR AU - Tarko, A. AU - Tian, Z. PY - 2003 DA - 2003// TI - Example analysis and handling of uncertainty in the highway capacity manual with consideration of traffic diversion JO - Transp Res Rec VL - 1852 UR - https://doi.org/10.3141/1852-06 DO - 10.3141/1852-06 ID - Tarko2003 ER - TY - JOUR AU - Iman, R. L. AU - Helton, J. C. PY - 1988 DA - 1988// TI - An investigation of uncertainty and sensitivity analysis techniques for computer models JO - Risk Anal VL - 8 UR - https://doi.org/10.1111/j.1539-6924.1988.tb01155.x DO - 10.1111/j.1539-6924.1988.tb01155.x ID - Iman1988 ER - TY - STD TI - Cullen AC, Frey HC (1999) Probabilistic exposure assessment: a handbook for dealing with variability and uncertainty in models and inputs. Plenum press; New York, USA ID - ref16 ER - TY - JOUR AU - Bulleit, W. M. PY - 2008 DA - 2008// TI - Uncertainty in structural engineering JO - Pract Period Struct Des Constr VL - 13 UR - https://doi.org/10.1061/(ASCE)1084-0680(2008)13:1(24) DO - 10.1061/(ASCE)1084-0680(2008)13:1(24) ID - Bulleit2008 ER - TY - STD TI - Highway Capacity Manual. (2010) Transportation research board, Special report 209, 5th edition ID - ref18 ER - TY - JOUR AU - Bunker, J. M. PY - 2014 DA - 2014// TI - Novel methods and the maximum likelihood estimation technique for estimating traffic critical gap JO - J Adv Transp VL - 48 UR - https://doi.org/10.1002/atr.1204 DO - 10.1002/atr.1204 ID - Bunker2014 ER - TY - JOUR AU - Brilon, W. AU - Troutbeck, R. AU - König, R. PY - 1999 DA - 1999// TI - Useful estimation procedures for critical gaps JO - Transp Res Part A Policy Pract VL - 33 UR - https://doi.org/10.1016/S0965-8564(98)00048-2 DO - 10.1016/S0965-8564(98)00048-2 ID - Brilon1999 ER - TY - STD TI - Kimber, R. and Coombe, R. (1980). The traffic capacity of some major priority junctions. Crowthorne, Berkshire, UK: Transport and Road Research Laboratory, Supplementary Report 582 ID - ref21 ER - TY - STD TI - Tollazzi T (2015) Alternative types of roundabouts: an informational guide. Springer tracts on transportation and traffic 6. Springer-Verlag. Springer international publishing. Switzerland ID - ref22 ER - TY - BOOK AU - Raff, M. S. AU - Hart, J. W. PY - 1950 DA - 1950// TI - A volume warrant for urban stop signs. The Eno foundation for highway traffic control PB - Saugatuck CY - Conn, USA ID - Raff1950 ER - TY - JOUR AU - Troutbeck, R. J. PY - 1986 DA - 1986// TI - Average delay at an unsignalized intersection with two major streams each having a dichotomized headway distribution JO - Transp Sci VL - 20 UR - https://doi.org/10.1287/trsc.20.4.272 DO - 10.1287/trsc.20.4.272 ID - Troutbeck1986 ER - TY - STD TI - Troutbeck RJ (1991) Recent Australian unsignalized intersection research and practices. Intersections without traffic signals II 1991; Springer-Verlag (Werner Brilon. Ed.): 238–257 ID - ref25 ER - TY - JOUR AU - Tian, Z. AU - Vandehey, M. AU - Robinson, B. W. AU - Kittelson, W. AU - Kyte, M. AU - Troutbeck, R. AU - Brilon, W. AU - Wu, N. PY - 1999 DA - 1999// TI - Implementing the maximum likelihood methodology to measure a driver's critical gap JO - Transp Res A VL - 33 ID - Tian1999 ER - TY - STD TI - Handbuch die Bemessung von Straben (HBS: German highway capacity manual). (2009) Forschungsgesellschaft für Straßen- und Verkehrswesen (FGSV): Cologne ID - ref27 ER - TY - STD TI - Rodegerdts L, Blogg M, Wemple E, Myers E, Kyte M, Dixon M, List G, Flannery A, Troutbeck R, Brilon W, Wu N, Persaud B, Lyon C, Harkey D, Carter D (2007) Roundabouts in the United States. NCHRP report 572. Transportation Research Board of the National Academic. Washington. D.C., USA ID - ref28 ER - TY - BOOK AU - Kyte, M. AU - Tian, Z. AU - Mir, Z. AU - Hameedmansoor, Z. AU - Kittelson, W. AU - Vandehey, M. AU - Robinson, B. AU - Brilon, W. AU - Bondzio, L. AU - Wu, N. AU - Troutbeck, R. J. PY - 1996 DA - 1996// TI - NCHRP web document 5: capacity and level of Service at Unsignalized Intersections: final report volume 1: two-way stop controlled intersections PB - Transportation Research Board CY - Washington, D.C., USA ID - Kyte1996 ER - TY - JOUR AU - Gonzalez, A. G. AU - Herrador, A. AU - Asuero, A. G. PY - 2005 DA - 2005// TI - Uncertainty evaluation from Monte-Carlo simulations by using Crystal-Ball software JO - Accred Qual Assur VL - 10 UR - https://doi.org/10.1007/s00769-004-0896-9 DO - 10.1007/s00769-004-0896-9 ID - Gonzalez2005 ER - TY - JOUR AU - Giuffrè, O. AU - Granà, A. AU - Tumminello, M. L. PY - 2016 DA - 2016// TI - Gap-accepteance parameters for roundabouts: a systematic review JO - Eur Transp Res Rev VL - 8 UR - https://doi.org/10.1007/s12544-015-0190-4 DO - 10.1007/s12544-015-0190-4 ID - Giuffrè2016 ER - TY - STD TI - Borenstein M, Hedges LV, Higgins JPT, Rothstein H R. (2009) Introduction to Meta-analysis. John Wiley & Sons, Ltd, Chichester, UK, doi:10.1002/9780470743386.ch13 ID - ref32 ER - TY - JOUR AU - Elvik, R. PY - 2011 DA - 2011// TI - Publication bias and time-trend bias in meta-analysis of bicycle helmet efficacy: a re-analysis of Attewell, Glase and McFadden, 2001 JO - Accid Anal Prev VL - 43 UR - https://doi.org/10.1016/j.aap.2011.01.007 DO - 10.1016/j.aap.2011.01.007 ID - Elvik2011 ER - TY - JOUR AU - Cochran, W. G. PY - 1950 DA - 1950// TI - The comparison of percentages in matched samples JO - Biometrika VL - 37 UR - https://doi.org/10.2307/2332378 DO - 10.2307/2332378 ID - Cochran1950 ER - TY - JOUR AU - Higgins, J. AU - Thompson, S. G. AU - Deeks, J. J. AU - Altman, D. G. PY - 2003 DA - 2003// TI - Measuring inconsistency in meta-analyses JO - BMJ VL - 327 UR - https://doi.org/10.1136/bmj.327.7414.557 DO - 10.1136/bmj.327.7414.557 ID - Higgins2003 ER - TY - JOUR AU - Gazzarri, A. AU - Martello, M. T. AU - Pratelli, A. AU - Souleyrette, R. PY - 2013 DA - 2013// TI - Gap acceptance parameters for HCM 2010 roundabout capacity model applications in Italy JO - Wit Ser Transp Syst Traffic Eng VL - 1 ID - Gazzarri2013 ER - TY - STD TI - Zheng D, Chitturi M, Bill A, Noyce D A (2011) Comprehensive evaluation of Wisconsin roundabouts volume 1: traffic operations. Wisconsin Traffic Operations and Safety Laboratory, Wisconsin, US, Available at http://wwwtopslabwiscedu/projects/4-10html Accessed 28 March 2013 UR - http://www.topslab.wisc.edu/projects/4-10.html ID - ref37 ER - TY - JOUR AU - Fortuijn, L. G. H. PY - 2009 DA - 2009// TI - Turbo roundabout. Estimation of capacity JO - Transp Res Rec VL - 2130 UR - https://doi.org/10.3141/2130-11 DO - 10.3141/2130-11 ID - Fortuijn2009 ER - TY - JOUR AU - Hagring, O. AU - Rouphail, N. M. AU - Sørensen, H. A. PY - 2003 DA - 2003// TI - Comparison of capacity models for two lane roundabouts JO - Transp Res Rec VL - 1852 UR - https://doi.org/10.3141/1852-15 DO - 10.3141/1852-15 ID - Hagring2003 ER - TY - STD TI - CROW (2008) Turborotondes [turbo roundabouts]. Publicatie 257. CROW Kenniscentrum voor verkeer, vervoer en infrastructuur [Dutch information and technology platform], The Netherlands, Ede ID - ref40 ER - TY - BOOK AU - Gravetter, F. J. AU - Wallnau, L. B. PY - 2013 DA - 2013// TI - Statistics for the behavioral sciences PB - Cengage Learning CY - Boston, US ID - Gravetter2013 ER - TY - BOOK AU - Morse, P. M. PY - 1982 DA - 1982// TI - Application of queuing theory PB - Chapman Hall CY - London ID - Morse1982 ER -