An Open Access Journal
From: Modelling delay saving through pro-active incident management techniques
Simulation tool | TIM technique | Total delay [veh-h] | Max queue extent [km] | Total duration [h] |
---|---|---|---|---|
CTM | 4.1 (close all lanes) | 3764 | 20 | 2.6 |
Queue model | 4.1 (close all lanes) | 3764 | 20 | 2.6 |
CTM | 4.2 (contraflow) | 1974 | 11 | 2.1 |
Queue model | 4.2 (contraflow) | 1908 | 11 | 2.1 |
CTM | 4.3 (close blocked lane) | 999 | 6 | 2.0 |
Queue model | 4.3 (close blocked lane) | 1024 | 7 | 2.0 |