1- Inscription of the project on the Master Plan |
2- Preliminary studies (impact assessment, route studies, cost-benefit analysis, multicriteria analysis, etc). |
3- Public debate (State, owner, local elected representatives, local companies, local residents, associations, etc). |
4- Schematic and preliminary design (impact assessment, route studies, cost-benefit analysis, multicriteria analysis, etc). |
5- Final draft design file (which can be sometimes modified while the public inquiry) |
6-Public Inquiry |
7- Public Utility Statement |