Skip to main content

An Open Access Journal

Table 4 Site PP1. Economic assessment of the different project alternativesa

From: Integrated American-European protocol for safety interventions on existing two-lane rural roads

Set

Combination

Costsb (€)

Benefitsb (€)

NPV (€)

BCR

Inc. BCA

A

1

280028,20

3402961,87

3122933,67

12,15

4

B

2

136261,61

1665087,70

1528826,09

12,22

6

C

3

226063,26

461302,01

235238,75

2,04

7

A + B

4

416289,81

4829842,24

4413552,43

11,60

2

A + C

5

506091,46

3786056,35

3279964,90

7,48

3

B + C

6

362324,88

2094098,57

1731773,69

5,78

5

A + B + C

7

642353,07

5186120,11

4543767,04

8,07

1

D

8

8771813,23

59272141,96

/

/

/

  1. aThe two more convenient alternatives are highlighted in boldface for each method used
  2. bCosts and benefits were actualized considering the whole life of the measures (10 years for short-term, 30 for long-term measures)