From: Analysis and modelling of performances of the HL (Hyperloop) transport system
Cost element |
Investment cost (106 €/km or unit)a) |
Annual cost (106 €/km or unit) a) |
Life span (years) |
---|---|---|---|
Track infrastructure | |||
- Pylons, solid soil | 25 | 0.92 | 60 |
- Pylons, weak soil | 35 | 1.28 | 60 |
- Tunnel | 70 | 2.57 | 60 |
Station | 116 | 4.64 | 50 |
Capsule | 4.8 | 0.58 | 10 |