Skip to main content

An Open Access Journal

Table 7 External costs along the South Tyrolean stretch of the Brenner corridor

From: Options for reducing external costs from freight transport along the Brenner corridor

External costs along the South Tyrolean stretch of the Brenner corridor (€cent/tnet)

 

Phase 0–2015

Phase 1–2027

Phase 2–2035

External effects

Specifications

Vehicle type 1

Train

Vehicle type 1

Train

Vehicle type 1

Train

a

Local pollution

Euro 1

85.46

Euro 2

85.02

Euro 3

64.85

Euro 4 SCR

27.54

Euro 5 SCR

17.35

12.28

12.28

Euro 6

2.56

1.86

1.86

b

Global pollution

Euro 1

62.64

Euro 2

62.28

Euro 3

63.52

Euro 4 SCR

62.07

Euro 5 SCR

62.24

59.39

Euro 6

63.17

50.66

50.66

c

Noise pollution

Day

High concentration

0.54

0.64

0.54

0.64

0.54

0.64

Low concentration

1.16

1.24

1.16

1.24

1.16

1.24

Night

Low concentration

2.02

2.10

2.02

2.10

2.02

2.10

d

Congestion

Flowing traffic

0.00

0.00

0.00

0.00

0.00

0.00

Pre-congestion

11.13

0.00

11.13

0.00

11.13

0.00

Congestion

25.59

0.00

25.59

0.00

25.59

0.00

e

Accidents

Death, serious injuries, accident

22.46

0.004

22.46

0.004

22.46

0.004

f

Total

Euro 1

196.69

0.65

Euro 2

195.89

0.65

Euro 3

176.97

0.65

Euro 4 SCR

138.20

0.65

Euro 5 SCR

128.18

0.65

110.26

Euro 6

114.33

0.65

101.11

101.11

Average Value

158.38

0.65

105.68

0.65

101.11

0.65