Skip to main content

Table 7 External costs along the South Tyrolean stretch of the Brenner corridor

From: Options for reducing external costs from freight transport along the Brenner corridor

External costs along the South Tyrolean stretch of the Brenner corridor (€cent/tnet)
  Phase 0–2015 Phase 1–2027 Phase 2–2035
External effects Specifications Vehicle type 1 Train Vehicle type 1 Train Vehicle type 1 Train
a Local pollution Euro 1 85.46
Euro 2 85.02
Euro 3 64.85
Euro 4 SCR 27.54
Euro 5 SCR 17.35 12.28 12.28
Euro 6 2.56 1.86 1.86
b Global pollution Euro 1 62.64
Euro 2 62.28
Euro 3 63.52
Euro 4 SCR 62.07
Euro 5 SCR 62.24 59.39
Euro 6 63.17 50.66 50.66
c Noise pollution Day High concentration 0.54 0.64 0.54 0.64 0.54 0.64
Low concentration 1.16 1.24 1.16 1.24 1.16 1.24
Night Low concentration 2.02 2.10 2.02 2.10 2.02 2.10
d Congestion Flowing traffic 0.00 0.00 0.00 0.00 0.00 0.00
Pre-congestion 11.13 0.00 11.13 0.00 11.13 0.00
Congestion 25.59 0.00 25.59 0.00 25.59 0.00
e Accidents Death, serious injuries, accident 22.46 0.004 22.46 0.004 22.46 0.004
f Total Euro 1 196.69 0.65
Euro 2 195.89 0.65
Euro 3 176.97 0.65
Euro 4 SCR 138.20 0.65
Euro 5 SCR 128.18 0.65 110.26
Euro 6 114.33 0.65 101.11 101.11
Average Value 158.38 0.65 105.68 0.65 101.11 0.65