An Open Access Journal
Feasible with high risk | Limited feasibility | Feasible | Safely feasible | |
---|---|---|---|---|
Outstanding utility | Increase of the number reliably navigable days | Liquidation of bottlenecks on railway TEN-T corridor; Development of railway transit capacity in Budapest; Construction of the missing comprehensive TEN-T public road network elements; | Demand-based planning of public transport services; Low cost development of railway services in the urban and suburban traffic; Development of mode changing (P&R, B&R) systems; Development of urban freight transport; Traffic safety interventions in Budapest; Traffic safety developments of the railway network; | Implementation of management tools with special regard to renovation of existing infrastructure; Improvement of travel conditions by facilitating connections in suburban traffic; Reasonable development of bus transport in suburban areas without railway connection; Traffic safety interventions in big cities; |
High utility | Building missing sections of M0 ring road (around Budapest) | Liquidation of bottlenecks on national railway network; Development of the existing motorway and main road network; Railway development of suburban traffic of big cities; Development of intermodal infrastructure; Integrated development of rail-guided systems; Building of missing motorway links to country capitals; Completion of missing transversal public road elements; Development of the missing links of the comprehensive European, national Cycling network; Development of ports in and outside the IWWs TEN-T network in order to establish the missing supporting infrastructure; | Railway hub and station development; Traffic safety developments on existing road junctions; Building of missing public road TEN-T network elements; Development of bypass roads; | Program for replacement railway passenger transport vehicles and buses; |
Medium utility | TSI-based development of the core TEN-T network railway elements; Liquidation of bottlenecks on the regional railway network; Modernization of main railway lines; Providing the expected parameters for the TEN-T IWW, river Danube; Development of passenger ports infrastructure and provision of better access from their neighboring area, development of passenger transport ships, | TSI-based development of TEN-T railway trunk network elements; Development of international railways in high traffic relations; | ||
Low utility | Development of competitive regional airports | Development of aerial TEN-T core network; Significant development of low traffic railway lines | Elimination of bottlenecks of low traffic railway lines, development of services; | |
Legend | Future possibilities | Preparation can be supported | Implementation can be supported | To be implemented primarily |