Skip to main content

An Open Access Journal

Table 4 (a, b) Parameter estimates and goodness-of-fit of the lognormal regression model of PSD

From: An evaluation of the passing process through road - vehicle parameters assessment

Parameter

B

Std. Error

t-value

p value

(a) EKL2

(Intercept)

3.19150

0.01520

209.949

< 0.001

ΔV

− 0.01555

0.00043

− 35.750

< 0.001

P fmax

− 0.00070

0.00024

− 2.949

0.004

s ΔV

0.00018

0.00004

4.808

< 0.001

Null log-likelihood

48.947

  

Final log-likelihood

166.033

  

Likelihood ratio test

2.443

  

df

3

  

Adjusted R-squared

0.942

  

(b) EKL3

(Intercept)

3.15000

0.01532

205.567

< 0.001

ΔV

− 0.01560

0.00044

− 35.588

< 0.001

P fmax

− 0.00072

0.00024

− 3.006

0.00357

s ΔV

0.00015

0.00003

4.775

< 0.001

Null log-likelihood

48.641

  

Final log-likelihood

165.389

  

Likelihood ratio test

2.448

  

df

3

  

Adjusted R-squared

0.944